05/01/2014 | Finishing off the last job of 2013, the starboard rail for fenders | DSC01784 |
06/01/2014 | Laying out the templates for the port toprail | DSC01785 |
06/01/2014 | Six pieces make up the toprail | DSC01787 |
07/01/2014 | and they are rough cut | DSC01789 |
09/01/2014 | First piece notched and in place | DSC01791 |
12/01/2014 | A few days of drizzle so I took off all the remaining old toprail | DSC01798 |
16/01/2014 | Two pieces fitted and the third in place to mark the joint | DSC01799 |
18/01/2014 | Three fitted and the fourth all cut but another round of dreich weather… | DSC01802 |
21/01/2014 | Five down, one to go | DSC01803 |
23/01/2014 | All the oak in place. Gunwhale planks next and the fender bar | DSC01806 |
25/01/2014 | New gunwhale planks in place, just the original lower plank to fit | DSC01808 |
31/01/2014 | Fed up with being rained off I repaint the CAV AC2032 alternator | DSC01814 |
01/02/2014 | Got the fender rail all ready… and then it started raining… | DSC01815 |
15/02/2014 | Change of plans with the toprail. I have now put a nice radius on either side. | DSC01819 |
16/02/2014 | and that is the undercoat done. Had to revisit the starboard toprail to do the radius and update the undercoat. This is the final piece that joins both sides | DSC01822 |
20/02/2014 | February was the wheelhouse design and layout. This is the current thoughts for the layout | DSC01824_annotated |
20/02/2014 | and from a different view which also shows the bulwark stringer completed | DSC01825 |
22/02/2014 | All very well having a wheelhouse design on paper but what will it look like for real. Lets put up a frame to get some visualisation | DSC01830 |
22/02/2014 | And this is close to what it might look like | DSC01831 |
24/02/2014 | with a bit of editing | DSC01829x |
27/02/2014 | I was going to clad the frame with cardboard painted to show windows and doors but it has been very windy and this is as far as it got in the kitchen | DSC01833 |
03/03/2014 | Undercoat on the port side | DSC01836 |
09/03/2014 | Topside blue completed | DSC01837 |
10/03/2014 | Some artwork | DSC01839 |
11/03/2014 | Digression onto the mast, a nice new undercoat | DSC01840 |
12/03/2014 | More artwork | DSC01841 |
17/03/2014 | We have a mast…. | DSC01846 |
22/03/2014 | Oak for wheelhouse framing arrives | DSC01848 |
25/03/2014 | Just like a big jigsaw | DSC01850 |
26/03/2014 | You can see the spots of rain… | DSC01851 |
27/03/2014 | But that doesn't stop a deadicated worker | DSC01852 |
30/03/2014 | First two panels in place and the third under construction | DSC01853 |
01/04/2014 | Three up and the fourth nearly ready | DSC01854 |
03/04/2014 | Just like that… | DSC01855 |
06/04/2014 | That is as far as the door opening on either side | DSC01860 |
08/04/2014 | The wheelhouse front is a bit more complicated with multiple angles | DSC01861 |
10/04/2014 | See what in mean… | DSC01864 |
10/04/2014 | but we are getting there | DSC01865 |
13/04/2014 | Fabricate the overhanging front | DSC01866 |
17/04/2014 | Took a few days to get it right | DSC01868 |
20/04/2014 | A number of roof beams, gravity mounted, give a good impression of what it will look like, and pretend windows for good measure | DSC01869 |
22/04/2014 | Still gravity mounted but that is now many I need | DSC01870 |
25/04/2014 | Beams fixed and end fillers in place | DSC01871 |
26/04/2014 | Dwangs will add strength | DSC01872 |
28/04/2014 | It makes a nice pattern | DSC01875 |
29/04/2014 | And then dwangs for the walls | DSC01876 |
07/05/2014 | All complete, waiting for marine plywood cladding | DSC01897 |
12/05/2014 | Here we go.. | DSC01901 |
13/05/2014 | Good progress | DSC01902 |
14/05/2014 | The forward end is a bit more complicated | DSC01903 |
15/04/2014 | Especially for the stairhead | DSC01904 |
29/04/2014 | Nearly there with the wall cladding | DSC01959 |
03/06/2014 | After having May as a holiday here we are with the wall ply complete | DSC01979 |
05/06/2014 | The roof ply is roughed to size. Will only fit once I've fibgreglassed the walls | DSC02007 |
12/06/2014 | Been a bit wet so inside work and fit up bracket to mount the steering | DSC02009 |
14/06/2014 | Start of the fibreglassing | DSC02010 |
15/06/2014 | And finally the forward-facing side | DSC02011 |
17/06/2014 | The topcoat is much easier | DSC02013 |
18/06/2014 | Get rid of the tarpaulin and fit the roof ply | DSC02015 |
28/06/2014 | With the drip edge fitted along with the various upstands it begins to look the business | DSC02026 |
29/06/2014 | Time to go on the grid and do the antifoul and anodes. Also check out a couple of small leaks | DSC02027 |
30/06/2014 | Have to admit I had help with the boot-top, this is Eric cutting in the blue as the last of the tide washes his wellies… | DSC02029 |
30/06/2014 | And the final finish looks quite smart… | DSC02030 |
30/06/2014 | especially with the wheelhouse | DSC02031 |
02/07/2014 | Time to attach the hull planks | DSC02032 |
03/07/2014 | Two fitted to lowest of the three rows | DSC02033 |
12/07/2014 | One in the middle row… but also note a window… | DSC02035 |
14/07/2014 | a few more planks and windows | DSC02038 |
14/07/2014 | Looking good | DSC02039 |
16/07/2014 | Forward facing windows fitted | DSC02044 |
19/07/2014 | The steambox | DSC02043 |
19/07/2014 | Tested with the shorted plank that needed steamed | DSC02042 |
20/07/2014 | Getting close to Herring Queen so a few flags and the second steamed plank | DSC02045 |
21/07/2014 | Second row complete | DSC02047 |
22/07/2014 | Better get some paint on the go | DSC02048 |
25/07/2014 | Undercoat complete, just a topcoat and I will be all set | DSC02059 |
31/07/2014 | We made it… Thanks to Tim for the photo of us up at St Abbs Head | DSC00TIM |
15/08/2014 | Fake planks removed and real planks in place | DSC02064 |
25/08/2014 | Bulkhead either end of the engineroom removed | DSC02067 |
17/09/2014 | Internal insulation and temporary fitting of lights in the deckhouse | DSC02071 |
22/09/2014 | Engineroom/Crew accomodation bulkhead renewed but still needs plywood facing and soundproofing on the engine side | DSC02072 |
03/10/2014 | likewise for the main accomodation bulkhead | DSC02073 |
16/11/2014 | Starting to clad out the wheelhouse | DSC02102 |
18/11/2014 | Beginning to look cosy | DSC02103 |
01/12/2014 | Some undercoat | DSC02106 |
08/12/2014 | Christmas not far away so how about some decorations | DSC02107 |
15/12/2014 | The cover strips are cut from the various oak offcuts. That take a long time to make | DSC02109 |
17/12/2014 | But it does finish the job off nicely | DSC02111 |